Skip to content
Elora GridLand & Grid
Data centre · Netherlands

Global Switch fase 1 Johan Huizingalaan 759

Global Switch fase 1 Johan Huizingalaan 759 is a data centre project in Johan Huizingalaan 759 1066VH Amsterdam. The reported operator is Global Switch fase 1.

Amsterdam, Netherlands

View Global Switch fase 1 Johan Huizingalaan 759 on the map

Operating

Evidence reviewed 10 Nov 2026

About this location

Global Switch fase 1 Johan Huizingalaan 759 is a data centre project in Johan Huizingalaan 759 1066VH Amsterdam. The reported operator is Global Switch fase 1.

Status evidence

Explicit provincial datacenter status: Operationeel. Source date not stated; collection date is not a commissioning date. In ontwikkeling is not automatically construction.

Location evidence

Official provincial datacenter layer point, based on LISA/BAG addresses and provincial curation; radius allows entrance/building/campus positioning. Not a surveyed building footprint.

Address
Johan Huizingalaan 759 1066VH Amsterdam
Country
Netherlands
Reported operator
Global Switch fase 1
Location uncertainty
300 m radius; not a surveyed boundary

Electrical work and project outlook

Probability not assessed. Builder, electrical contractor and current procurement availability are not confirmed in the published research.

Review the original sources below for the reported operator, project status and electricity infrastructure. A listed facility does not imply an open tender.

Research methodology · Entity JSON · Markdown

Location and nearby places

Nearby Bulk Supply Points and substations

No substation records within 15 km.

Nearby mine sites

No mine records within 15 km.

Sources and dates

Research compiled by Elora Grid.

  1. 01
Data notes

Distances use published location points. Nearby records may represent separate phases of one facility. Connection capacity and commissioning require current network information.