Ark Longcross Park is a permit-only research location; a current data-centre project is unconfirmed in Longcross Park, Longcross Park, Chobham Lane, Longcross, Chertsey, KT16 0EE. The reported operator is ARK DATA CENTRES LIMITED.

Runnymede, United Kingdom

View Ark Longcross Park on the map

Permit only

Evidence reviewed 10 Nov 2026

About this location

Ark Longcross Park is a permit-only research location; a current data-centre project is unconfirmed in Longcross Park, Longcross Park, Chobham Lane, Longcross, Chertsey, KT16 0EE. The reported operator is ARK DATA CENTRES LIMITED.

Status evidence

Effective government permission; operator RFS/capacity/roster entries do not independently prove this phase is operating.

Location evidence

Published EA site grid reference SU9789665526 transformed OSGB36 to WGS84; 350 m screening radius covers point placement uncertainty, not a surveyed boundary. Site address/postcode checked for locality consistency.

Address
Longcross Park, Longcross Park, Chobham Lane, Longcross, Chertsey, KT16 0EE
Country
United Kingdom
Reported operator
ARK DATA CENTRES LIMITED
Source date
2025-11-14
Status observation date
2025-11-14
Location uncertainty
350 m radius; not a surveyed boundary

Electrical work and project outlook

Probability not assessed. Builder, electrical contractor and current procurement availability are not confirmed in the published research.

Review the original sources below for the reported operator, project status and electricity infrastructure. A listed facility does not imply an open tender.

Research methodology · Entity JSON · Markdown

Location and nearby places

Nearby Bulk Supply Points and substations

No substation records within 15 km.

Nearby mine sites

No mine records within 15 km.

Sources and dates

Research compiled by Elora Grid.

  1. 01
    Longcross Park

    2025-11-14

  2. 02
Data notes

Distances use published location points. Nearby records may represent separate phases of one facility. Connection capacity and commissioning require current network information.