Skip to content
Elora GridLand & Grid
Data centre · United Kingdom

Colt London North

Colt London North is a data centre project in 20, Colt Welwyn Garden - EPR/KP3139DW, Blackfan Road, Welwyn Garden City, AL7 1QA. The reported operator is COLT DATA CENTRE SERVICES UK LIMITED.

Welwyn Hatfield, United Kingdom

View Colt London North on the map

Operating

Evidence reviewed 10 Nov 2026

About this location

Colt London North is a data centre project in 20, Colt Welwyn Garden - EPR/KP3139DW, Blackfan Road, Welwyn Garden City, AL7 1QA. The reported operator is COLT DATA CENTRE SERVICES UK LIMITED.

Status evidence

Current undated operator page describes active delivered colocation/customer infrastructure at the matched permitted campus. Historical RFS year is contextual only.

Location evidence

Published EA site grid reference TL2536012800 transformed OSGB36 to WGS84; 350 m screening radius covers point placement uncertainty, not a surveyed boundary. Site address/postcode checked for locality consistency.

Address
20, Colt Welwyn Garden - EPR/KP3139DW, Blackfan Road, Welwyn Garden City, AL7 1QA
Country
United Kingdom
Reported operator
COLT DATA CENTRE SERVICES UK LIMITED
Source date
2019-01-18
Location uncertainty
350 m radius; not a surveyed boundary

Electrical work and project outlook

Probability not assessed. Builder, electrical contractor and current procurement availability are not confirmed in the published research.

Review the original sources below for the reported operator, project status and electricity infrastructure. A listed facility does not imply an open tender.

Research methodology · Entity JSON · Markdown

Location and nearby places

Nearby Bulk Supply Points and substations

No substation records within 15 km.

Nearby mine sites

No mine records within 15 km.

Sources and dates

Research compiled by Elora Grid.

  1. 01
    20

    2019-01-18

  2. 02
  3. 03
  4. 04
Data notes

Distances use published location points. Nearby records may represent separate phases of one facility. Connection capacity and commissioning require current network information.