Skip to content
Elora GridLand & Grid
Data centre · United Kingdom

CYRUSONE UK3 LIMITED — SL1 4ST

CYRUSONE UK3 LIMITED — SL1 4ST is a permit-only research location; a current data-centre project is unconfirmed in 700, CyrusOne London 3 Datacentre, Stirling Road, Slough, SL1 4ST. The reported operator is CYRUSONE UK3 LIMITED.

Slough, United Kingdom

View CYRUSONE UK3 LIMITED — SL1 4ST on the map

Permit only

Evidence reviewed 10 Nov 2026

About this location

CYRUSONE UK3 LIMITED — SL1 4ST is a permit-only research location; a current data-centre project is unconfirmed in 700, CyrusOne London 3 Datacentre, Stirling Road, Slough, SL1 4ST. The reported operator is CYRUSONE UK3 LIMITED.

Status evidence

Effective government environmental permit for a named data-centre installation or first-party-matched DC site; construction/operation not inferred from permit issue date.

Location evidence

Published EA site grid reference SU9534081680 transformed OSGB36 to WGS84; 350 m screening radius covers point placement uncertainty, not a surveyed boundary. Site address/postcode checked for locality consistency.

Address
700, CyrusOne London 3 Datacentre, Stirling Road, Slough, SL1 4ST
Country
United Kingdom
Reported operator
CYRUSONE UK3 LIMITED
Source date
2021-02-16
Status observation date
2021-02-16
Location uncertainty
350 m radius; not a surveyed boundary

Electrical work and project outlook

Probability not assessed. Builder, electrical contractor and current procurement availability are not confirmed in the published research.

Review the original sources below for the reported operator, project status and electricity infrastructure. A listed facility does not imply an open tender.

Research methodology · Entity JSON · Markdown

Location and nearby places

Nearby Bulk Supply Points and substations

No substation records within 15 km.

Nearby mine sites

No mine records within 15 km.

Sources and dates

Research compiled by Elora Grid.

  1. 01
    700

    2021-02-16

Data notes

Distances use published location points. Nearby records may represent separate phases of one facility. Connection capacity and commissioning require current network information.