Skip to content
Elora GridLand & Grid
Data centre · United Kingdom

Enterprise House

Enterprise House is a data centre project in Enterprise House, MA1, Lloyd Street North, Manchester Science Park, Lancashire, M15 6SE. The reported operator is EQUINIX (UK) LIMITED.

Manchester, United Kingdom

View Enterprise House on the map

Operating

Evidence reviewed 10 Nov 2026

About this location

Enterprise House is a data centre project in Enterprise House, MA1, Lloyd Street North, Manchester Science Park, Lancashire, M15 6SE. The reported operator is EQUINIX (UK) LIMITED.

Status evidence

Operator current colocation availability lists MA1 with on-site operational coverage; matching government permit site identity/address retained. Current page undated; reviewed2026-11-10 separately from historical permit issue date.

Location evidence

Published EA site grid reference SJ8440096410 transformed OSGB36 to WGS84; 350 m screening radius covers point placement uncertainty, not a surveyed boundary. Site address/postcode checked for locality consistency.

Address
Enterprise House, MA1, Lloyd Street North, Manchester Science Park, Lancashire, M15 6SE
Country
United Kingdom
Reported operator
EQUINIX (UK) LIMITED
Source date
2021-01-06
Location uncertainty
350 m radius; not a surveyed boundary

Electrical work and project outlook

Probability not assessed. Builder, electrical contractor and current procurement availability are not confirmed in the published research.

Review the original sources below for the reported operator, project status and electricity infrastructure. A listed facility does not imply an open tender.

Research methodology · Entity JSON · Markdown

Location and nearby places

Nearby Bulk Supply Points and substations

No substation records within 15 km.

Nearby mine sites

No mine records within 15 km.

Sources and dates

Research compiled by Elora Grid.

  1. 01
  2. 02
  3. 03
  4. 04
  5. 05
  6. 06
  7. 07
Data notes

Distances use published location points. Nearby records may represent separate phases of one facility. Connection capacity and commissioning require current network information.