ISDC Development (No2 Limited
ISDC Development (No2 Limited is a data centre project in ISDC Development (No2 Limited, Romford North Data Centre, Unit 3 King George close, Romford, Essex, RM7 7PN. The reported operator is GREEN MOUNTAIN DC UK LIMITED.
Havering, United Kingdom
Evidence reviewed 10 Nov 2026
About this location
ISDC Development (No2 Limited is a data centre project in ISDC Development (No2 Limited, Romford North Data Centre, Unit 3 King George close, Romford, Essex, RM7 7PN. The reported operator is GREEN MOUNTAIN DC UK LIMITED.
Status evidence
Current government CCA membership for the exact DATC facilityID corroborates use as a qualifying DC process; separate plant-permission record retained. This is a source declaration, not field verification.
Location evidence
Published EA site grid reference TQ5027089800 transformed OSGB36 to WGS84; 350 m screening radius covers point placement uncertainty, not a surveyed boundary. Site address/postcode checked for locality consistency.
- Address
- ISDC Development (No2 Limited, Romford North Data Centre, Unit 3 King George close, Romford, Essex, RM7 7PN
- Country
- United Kingdom
- Reported operator
- GREEN MOUNTAIN DC UK LIMITED
- Source date
- 2015-04-21
- Status observation date
- 2026-09-18
- Location uncertainty
- 350 m radius; not a surveyed boundary
Electrical work and project outlook
Probability not assessed. Builder, electrical contractor and current procurement availability are not confirmed in the published research.
Review the original sources below for the reported operator, project status and electricity infrastructure. A listed facility does not imply an open tender.
Location and nearby places
Nearby Bulk Supply Points and substations
No substation records within 15 km.
Nearby mine sites
No mine records within 15 km.
Sources and dates
Research compiled by Elora Grid.
- 01ISDC Development (No2 Limited
2015-04-21
- 02
- 03Schedule4 named DC facility DATC/F00133
2020-12-18
- 04
- 05Schedule4 named DC facility DATC/F00168
2020-12-18
Data notes
Distances use published location points. Nearby records may represent separate phases of one facility. Connection capacity and commissioning require current network information.