Milton Keynes Data Centre is a data centre project in Milton Keynes Data Centre, 1 Brick Close, Kiln Farm, Milton Keynes, MK11 3JB. The reported operator is nLighten Milton Keynes Limited.

Milton Keynes, United Kingdom

View Milton Keynes Data Centre on the map

Operating

Evidence reviewed 10 Nov 2026

About this location

Milton Keynes Data Centre is a data centre project in Milton Keynes Data Centre, 1 Brick Close, Kiln Farm, Milton Keynes, MK11 3JB. The reported operator is nLighten Milton Keynes Limited.

Status evidence

Current first-party UK edge portfolio identifies milton-keynes as an operating regional edge data centre; government permit site postcode/location retained. Current page undated; reviewed2026-11-10 separately from historical permit issue date.

Location evidence

Published EA site grid reference SP8110738851 transformed OSGB36 to WGS84; 350 m screening radius covers point placement uncertainty, not a surveyed boundary. Site address/postcode checked for locality consistency.

Address
Milton Keynes Data Centre, 1 Brick Close, Kiln Farm, Milton Keynes, MK11 3JB
Country
United Kingdom
Reported operator
nLighten Milton Keynes Limited
Source date
2025-11-10
Location uncertainty
350 m radius; not a surveyed boundary

Electrical work and project outlook

Probability not assessed. Builder, electrical contractor and current procurement availability are not confirmed in the published research.

Review the original sources below for the reported operator, project status and electricity infrastructure. A listed facility does not imply an open tender.

Research methodology · Entity JSON · Markdown

Location and nearby places

Nearby Bulk Supply Points and substations

No substation records within 15 km.

Nearby mine sites

No mine records within 15 km.

Sources and dates

Research compiled by Elora Grid.

  1. 01
  2. 02
Data notes

Distances use published location points. Nearby records may represent separate phases of one facility. Connection capacity and commissioning require current network information.