Units 1, 2 and 4, LCY10
Units 1, 2 and 4, LCY10 is a permit-only research location; a current data-centre project is unconfirmed in Units 1, 2 and 4, LCY10, LCY10 Datacentre EPR/QP3108ST, Greenwich View Place, Isle of Dogs, London, E14 9NN. The reported operator is SOF-11 DOCKLANDS DC UK BIDCO LIMITED.
Tower Hamlets, United Kingdom
Evidence reviewed 10 Nov 2026
About this location
Units 1, 2 and 4, LCY10 is a permit-only research location; a current data-centre project is unconfirmed in Units 1, 2 and 4, LCY10, LCY10 Datacentre EPR/QP3108ST, Greenwich View Place, Isle of Dogs, London, E14 9NN. The reported operator is SOF-11 DOCKLANDS DC UK BIDCO LIMITED.
Status evidence
Effective government environmental permit for a named data-centre installation or first-party-matched DC site; construction/operation not inferred from permit issue date.
Location evidence
Published EA site grid reference TQ3767079260 transformed OSGB36 to WGS84; 350 m screening radius covers point placement uncertainty, not a surveyed boundary. Site address/postcode checked for locality consistency.
- Address
- Units 1, 2 and 4, LCY10, LCY10 Datacentre EPR/QP3108ST, Greenwich View Place, Isle of Dogs, London, E14 9NN
- Country
- United Kingdom
- Reported operator
- SOF-11 DOCKLANDS DC UK BIDCO LIMITED
- Source date
- 2022-08-31
- Status observation date
- 2022-08-31
- Location uncertainty
- 350 m radius; not a surveyed boundary
Electrical work and project outlook
Probability not assessed. Builder, electrical contractor and current procurement availability are not confirmed in the published research.
Review the original sources below for the reported operator, project status and electricity infrastructure. A listed facility does not imply an open tender.
Location and nearby places
Nearby Bulk Supply Points and substations
No substation records within 15 km.
Nearby mine sites
No mine records within 15 km.
Sources and dates
Research compiled by Elora Grid.
- 01Units 1, 2 and 4, LCY10
2022-08-31
Data notes
Distances use published location points. Nearby records may represent separate phases of one facility. Connection capacity and commissioning require current network information.