Skip to content
Elora GridLand & Grid
Data centre · Australia · New South Wales

Data centre - 42A BLUETT DRIVE SMEATON GRANGE 2567

Data centre - 42A BLUETT DRIVE SMEATON GRANGE 2567 is a data centre project in 42A BLUETT DRIVE SMEATON GRANGE 2567.

SMEATON GRANGE, New South Wales, Australia

View Data centre - 42A BLUETT DRIVE SMEATON GRANGE 2567 on the map

Determined outcome unverified

Evidence reviewed 5 Nov 2026

About this location

Data centre - 42A BLUETT DRIVE SMEATON GRANGE 2567 is a data centre project in 42A BLUETT DRIVE SMEATON GRANGE 2567.

Address
42A BLUETT DRIVE SMEATON GRANGE 2567
Country
Australia
State / region
New South Wales
Source date
2025-05-13
Status evidence
Public online DA feed; determined does not establish consent outcome

Electrical work and project outlook

Probability not assessed. Builder, electrical contractor and current procurement availability are not confirmed in the published research.

Review the original sources below for the reported operator, project status and electricity infrastructure. A listed facility does not imply an open tender.

Research methodology · Entity JSON · Markdown

Location and nearby places

Nearby Bulk Supply Points and substations

27 records within 15 km.

Show 22 more

Nearby mine sites

No mine records within 15 km.

Sources and dates

Research compiled by Elora Grid.

  1. 01
    Original source

    2025-05-13

Data notes

Distances use published location points. Nearby records may represent separate phases of one facility. Connection capacity and commissioning require current network information.