Microsoft Kemps Creek — Building Two (Stage 2)

Microsoft identifies Building Two as the second construction stage at Kemps Creek, separate from the operational Building One. The builder’s Stage 2 document register identifies SSD-10101987. Microsoft reported Building Two construction advancing in May 2026.

Penrith, New South Wales, Australia

View Microsoft Kemps Creek — Building Two (Stage 2) on the map

Planning approved

Evidence reviewed 5 Nov 2026

Documented scope

Microsoft identifies Building Two as the second construction stage at Kemps Creek, separate from the operational Building One. The builder’s Stage 2 document register identifies SSD-10101987. Microsoft reported Building Two construction advancing in May 2026.

Address
706-769 Mamre Road, Kemps Creek
Country
Australia
State / region
New South Wales
Record scope
Individual development phase

Electrical work and project outlook

Probability not assessed. Builder, electrical contractor and current procurement availability are not confirmed in the published research.

Review the original sources below for the reported operator, project status and electricity infrastructure. A listed facility does not imply an open tender.

Research methodology · Entity JSON · Markdown

Location and nearby places

Nearby Bulk Supply Points and substations

55 records within 15 km.

3.1 km
Sydney West Bulk Supply Point (BSP)Eastern Creek, New South Wales, AustraliaExisting infrastructure
4.8 km
Show 50 more

Nearby mine sites

No mine records within 15 km.

Sources and dates

Research compiled by Elora Grid.

  1. 01
  2. 02
  3. 03
  4. 04
  5. 05
  6. 06
  7. 07
  8. 08
  9. 09
  10. 10
  11. 11
  12. 12
  13. 13
Data notes

Distances use published location points. Nearby records may represent separate phases of one facility. Connection capacity and commissioning require current network information.