Skip to content
Elora GridLand & Grid
Data centre · Australia · Northern Territory

Energy North Project Ares

Energy North proposes a 1 GW IT hyperscale campus near Elliott, integrated with solar, batteries and gas-fired generation.

Barkly region, near Elliott, Northern Territory, Australia

View Energy North Project Ares on the map

Environmental assessment process; referral stage documented

Evidence reviewed 5 Nov 2026

About this project

Energy North proposes a 1 GW IT hyperscale campus near Elliott, integrated with solar, batteries and gas-fired generation.

Country
Australia
State / region
Northern Territory
Location evidence
Address/locality only; facility point not verified

Electrical work and project outlook

Probability not assessed. Builder, electrical contractor and current procurement availability are not confirmed in the published research.

Review the original sources below for the reported operator, project status and electricity infrastructure. A listed facility does not imply an open tender.

Research methodology · Entity JSON · Markdown

Nearby Bulk Supply Points and substations

No published location to calculate nearby sites.

Nearby mine sites

No published location to calculate nearby sites.

Sources and dates

Research compiled by Elora Grid.

  1. 01
Data notes

Distances use published location points. Nearby records may represent separate phases of one facility. Connection capacity and commissioning require current network information.