Microsoft reported site preparation, earthwork and utility relocation at Silver Springs in September 2026.

Nevada, United States

View Microsoft Silver Springs Datacenter on the map

Site preparation

Evidence reviewed 9 Nov 2026

Operator update

Microsoft reported site preparation, earthwork and utility relocation at Silver Springs in September 2026.

Country
United States
State / region
Nevada
Map locator scope
Campus locator
Reported operator
Microsoft
Reported owner
Microsoft Corporation
Related campus or site
Microsoft Silver Springs Datacenter
Reported project stage
Site preparation
Status reported as of
2026-09-29

Electrical work and project outlook

Probability not assessed. Builder, electrical contractor and current procurement availability are not confirmed in the published research.

Review the original sources below for the reported operator, project status and electricity infrastructure. A listed facility does not imply an open tender.

Research methodology · Entity JSON · Markdown

Location and nearby places

Nearby Bulk Supply Points and substations

No substation records within 15 km.

Nearby mine sites

No mine records within 15 km.

Sources and dates

Research compiled by Elora Grid.

  1. 01
    Microsoft

    Status observation for the listed project or phase. Status reported as of: 2026-09-29.

  2. 02
    Data Center Atlas

    Site or campus locator, as attributed in the source.

  3. 03
Data notes

Distances use published location points. Nearby records may represent separate phases of one facility. Connection capacity and commissioning require current network information.