Data centre · Australia · New South Wales

AirTrunk — legacy Stage 4 proposal

The legacy source labels this proposal AirTrunk Stage 4. Its exact phase boundary, footprint and relationship to the 51 Huntingwood Drive modification are not established by the retained entry. It is kept individually rather than merged using an assumed campus relationship.

Huntingwood, New South Wales, Australia

View AirTrunk — legacy Stage 4 proposal on the map

Evidence reviewed 5 Nov 2026

Documented scope

The legacy source labels this proposal AirTrunk Stage 4. Its exact phase boundary, footprint and relationship to the 51 Huntingwood Drive modification are not established by the retained entry. It is kept individually rather than merged using an assumed campus relationship.

Country
Australia
State / region
New South Wales
Reported operator
AirTrunk
Source date
2026-10-21
Record scope
Phase candidate

Electrical work and project outlook

Probability not assessed. Builder, electrical contractor and current procurement availability are not confirmed in the published research.

Review the original sources below for the reported operator, project status and electricity infrastructure. A listed facility does not imply an open tender.

Research methodology · Entity JSON · Markdown

Location and nearby places

Nearby Bulk Supply Points and substations

76 records within 15 km.

Show 71 more
Sydney West Bulk Supply Point (BSP)Eastern Creek, New South Wales, AustraliaExisting infrastructure
5.3 km
7.3 km
8.0 km
10.3 km
11.4 km
11.5 km
Kemps Creek 132kV BSPNew South WalesOperational
13.1 km

Nearby mine sites

No mine records within 15 km.

Sources and dates

Research compiled by Elora Grid.

  1. 01
    Original source

    2026-10-21

  2. 02
  3. 03
Data notes

Distances use published location points. Nearby records may represent separate phases of one facility. Connection capacity and commissioning require current network information.