GreenSquare SYD1 — campus overview
The SYD1 campus comprises an operating first stage and a separately proposed second stage. The operator's October 2026 announcement distinguishes them. Campus-wide power and capacity descriptions must not be assigned in full to each stage.
Norwest, New South Wales, Australia
Evidence reviewed 5 Nov 2026
Documented scope
The SYD1 campus comprises an operating first stage and a separately proposed second stage. The operator's October 2026 announcement distinguishes them. Campus-wide power and capacity descriptions must not be assigned in full to each stage.
Project research: Brookhollow Avenue Data Centre Expansion, Norwest.
- Address
- Norwest Business Park, 3 Brookhollow Ave, NSW 2153 Baulkham Hills, Australia
- Country
- Australia
- State / region
- New South Wales
- Reported operator
- GreenSquareDC
- Source date
- 2026-10-21
- Record scope
- Campus development programme
Electrical work and project outlook
Probability not assessed. Builder, electrical contractor and current procurement availability are not confirmed in the published research.
Review the original sources below for the reported operator, project status and electricity infrastructure. A listed facility does not imply an open tender.
Location and nearby places
Nearby Bulk Supply Points and substations
63 records within 15 km.
Show 58 more
Nearby mine sites
No mine records within 15 km.
Sources and dates
Research compiled by Elora Grid.
- 01Original source
2026-10-21
- 02GreenSquareDC website: SYD1 Norwest
2026-10-21
- 03
- 04Data Center Map facility listing
Discovery and directory address; operational status is not independently established by this listing.
- 05Operator or government facility evidence
Primary publisher contains the facility street address
- 06Operator or government facility evidence
Operator publisher identifies the exact facility code; address retained separately from directory
Data notes
Distances use published location points. Nearby records may represent separate phases of one facility. Connection capacity and commissioning require current network information.