IREN Sweetwater 1
IREN Sweetwater 1 is a data center development record in Texas.
Texas, United States
Evidence reviewed 9 Nov 2026
- Country
- United States
- State / region
- Texas
- Map locator scope
- Campus locator
- Reported operator
- IREN
- Reported owner
- IE US Development Holdings 5 Inc; IREN
- Related campus or site
- IREN Sweetwater 1 campus, FM 611, Fisher County (north of Sweetwater)
- Reported project stage
- Under construction
- Status reported as of
- 2026-11-05
Electrical work and project outlook
Probability not assessed. Builder, electrical contractor and current procurement availability are not confirmed in the published research.
Review the original sources below for the reported operator, project status and electricity infrastructure. A listed facility does not imply an open tender.
Location and nearby places
Nearby Bulk Supply Points and substations
3 records within 15 km.
Nearby mine sites
No mine records within 15 km.
Sources and dates
Research compiled by Elora Grid.
- 01IREN
Status observation for the listed project or phase. Status reported as of: 2026-11-05.
- 02Data Center Atlas
Site or campus locator, as attributed in the source.
- 03
Data notes
Distances use published location points. Nearby records may represent separate phases of one facility. Connection capacity and commissioning require current network information.