Side-by-side reference

Understand the difference.

Compare the meaning, drawing context and source references of two entries. A similar graphic or shared abbreviation does not establish equivalence.

Cable entryAutomationDirect cable entry frames: equipment preview
General arrangement objects

AutomationDirect cable entry frames

Choose the frame and the individual inserts as one entry schedule. Reserve cable approach space on the appropriate side of the enclosure wall.

Drawing use
GA
Application
Equipment layouts
Reference family
Manufacturer

A distinction that matters

The frame opening is not the sealing diameter of an insert. A preterminated cable also needs connector-passage clearance.

Full reference
GACable-entry frame: equipment preview
General arrangement objects

Cable-entry frame

A cable-entry frame organises one or more cables through a documented enclosure opening.

Drawing use
GA / Schematic
Application
Connections & wiring
Reference family
Manufacturer

A distinction that matters

A modular transit and individual cable glands use different assembly interfaces.

Full reference

Follow the full entry for source drawings and the appropriate standard or selected product. Equipment previews show a manufacturer drawing where available, otherwise a 3D thumbnail.

Compare electrical drawing references | Elora Grid