Side-by-side reference

Understand the difference.

Compare the meaning, drawing context and source references of two entries. A similar graphic or shared abbreviation does not establish equivalence.

MBBMake-before-break changeover contact: original educational illustration
Symbols

Make-before-break changeover contact

A make-before-break changeover contact establishes the next path before releasing the previous path during its documented transfer. The temporary overlap must be understood for the connected circuits.

Drawing use
Schematic
Application
Control circuits
Reference family
IEC / Manufacturer

A distinction that matters

A break-before-make transfer opens the previous path before establishing the next.

Full reference
NONormally open contact: original educational illustration
Symbols

Normally open contact

A normally open contact is open in the normal state defined for the device. Operating its relay, pushbutton or other parent device may close the contact. The meaning of normal must be established from the drawing convention and equipment documentation; it is not necessarily the current live condition of the installation.

Drawing use
Schematic
Application
Control circuits
Reference family
IEC / IEEE / ANSI

A distinction that matters

Normally open describes the stated normal condition. A position indication or operating snapshot may use a different state convention.

Full reference

Original educational previews. Follow the source references on each full entry for the appropriate standard or selected product.

Compare electrical drawing references | Elora Grid