Three-phase motor
An electrical motor load connected to its switching and protective equipment.
Detects that an operating or starting sequence has not completed as required.
Detects that an operating or starting sequence has not completed as required.
In a drafting package, connect this reference to the start/sequence initiation and completion indications. The associated drawing should trace the timeout alarm and stopping or reset circuit; the number identifies the role and does not specify the terminal arrangement, ratings or operating settings.
Incomplete sequence supervision checks completion; a starts-per-hour limit is a separate 66 application.
These public references support the explanation and provide further detail. Their graphics and downloadable files remain with their publishers.
Public manufacturer number/name association. Drafting explanations are independently written.
Normative device-number publication; exact edition wording and compliance require the licensed standard.
This illustration was authored independently by Elora Grid to explain the concept. It is not reproduced from a customer drawing, an official standard graphic or a manufacturer CAD file. Its correspondence to an exact IEC or IEEE symbol identifier has not been certified.
SVG and DXF downloads contain this original artwork. DXF uses unscaled drawing units; a GA envelope supplies no product dimensions, clearances or fabrication information. Original artwork is available under CC BY 4.0. Third-party references retain their own terms.
Elora Grid helps electrical teams work with drawings, specifications and equipment information. Explore the drafting workflow or join the early-access waitlist.