What this block does

Identifies the line-side voltage supplied to the assigned synchronising measurement.

A simple example

In a substation bay, one voltage circuit can feed protection while a separately identified winding supplies metering. A voltage-selection circuit must make clear which bus or line measurement is being used. For this reference, the drawing identifies “Line-side VT signal” at the input and “Synchronising voltage input” at the output. Both sides require identified references.

Line-side VT signalLSIISynchronising voltage input
A reading guide. The entry's original illustration and input/output facts describe this application.

What the drawings help you do

Start at the named input: Line-side VT signal. Identify its source device or document and the state represented on the drawing. Follow the named output: Synchronising voltage input. Cross-reference its destination and separate the command from confirmation that the equipment responded.

Input
Line-side VT signal
Output
Synchronising voltage input
Application reference
An explanation of a named drawing function or circuit relationship; the project documents define the equipment and its connections.

Read the source: Indoor current and voltage transformers

Schematic · LSIILine-voltage synchronising input interface: original educational illustration
Original educational illustrationSee source and graphic notes

What it represents

Identifies the line-side voltage supplied to the assigned synchronising measurement. A voltage-transformer secondary arrangement connects a defined primary voltage measurement to protection, metering or control inputs. Winding identity, fuse protection and the voltage reference must remain visible across the drawing.

In a substation bay, one voltage circuit can feed protection while a separately identified winding supplies metering. A voltage-selection circuit must make clear which bus or line measurement is being used. For this reference, the drawing identifies “Line-side VT signal” at the input and “Synchronising voltage input” at the output. Both sides require identified references.

Show the primary measurement point, secondary connection, protective devices and relay reference. A missing measurement can resemble a real system disturbance unless the voltage-circuit health is supervised appropriately. The functional block is an independent explanation of this named application. Equipment-specific ratings, terminal connections and operating conditions must be established in the project documentation.

How to read it

  • Start at the named input: Line-side VT signal. Identify its source device or document and the state represented on the drawing.
  • Follow the named output: Synchronising voltage input. Cross-reference its destination and separate the command from confirmation that the equipment responded.
  • Both sides require identified references.
  • Show the primary measurement point, secondary connection, protective devices and relay reference. A missing measurement can resemble a real system disturbance unless the voltage-circuit health is supervised appropriately.

Information to show or reference

  • Label the source and connection reference for line-side vt signal.
  • Identify the destination and defined state of synchronising voltage input.
  • Record the equipment or control-document revision supporting this functional block.
  • Check this application limit in the project design: Both sides require identified references.

A distinction that matters

Both sides require identified references. This reference describes the named application; it does not establish a new IEC graphical symbol, an ANSI device-function number or an exact manufacturer connection diagram.

Sources you can follow

These public references support the explanation and provide further detail. Their graphics and downloadable files remain with their publishers.

Indoor current and voltage transformers

Public technical context for voltage-transformer secondary arrangements. Current and voltage measurement transformers and their secondary interfaces. The application text and educational graphic are independently authored; the publisher does not certify this representation.

ABB · Public reference checked 13 October 2026 · Link only

About this graphic

This illustration was authored independently by Elora Grid to explain the concept. It is not reproduced from a customer drawing, an official standard graphic or a manufacturer CAD file. Its correspondence to an exact IEC or IEEE symbol identifier has not been certified.

SVG and DXF downloads contain this original artwork. Original artwork is available under CC BY 4.0. Third-party references retain their own terms.

Entry JSON · Entry Markdown · Last editorial update: 3 November 2026

Put the reference into a drawing workflow.

Elora Grid helps electrical teams work with drawings, specifications and equipment information. Explore the drafting workflow or join the early-access waitlist.

Explore drafting