Functional block · MSTI

Microgrid synchronising timeout indication

Functional block · Microgrids

An independently authored application reference. The drawing shows the named function or circuit relationship; use the project legend and selected equipment documentation for its drafting form and connections.

Browse this installation focus

In plain English

What this block does

Reports that the assigned synchronising process did not complete within its defined interval.

A simple example

In a microgrid reconnecting at its point of common coupling, a synchroniser can adjust the island reference while a separate permissive confirms the permitted relationship across the open breaker. For this reference, the drawing identifies “Synchronising state and time” at the input and “Synchronization timeout” at the output. The alarm should identify the unmet condition.

Synchronising state and timeMSTISynchronization timeout
A reading guide. The entry's original illustration and input/output facts describe this application.

What the drawings help you do

Start at the named input: Synchronising state and time. Identify its source device or document and the state represented on the drawing. Follow the named output: Synchronization timeout. Cross-reference its destination and separate the command from confirmation that the equipment responded.

Input
Synchronising state and time
Output
Synchronization timeout
Application reference
An explanation of a named drawing function or circuit relationship; the project documents define the equipment and its connections.

Read the source: Microgrid Flex components and control design

Schematic · MSTIMicrogrid synchronising timeout indication: original educational illustration
Original educational illustrationSee source and graphic notes

What it represents

Reports that the assigned synchronising process did not complete within its defined interval. Synchronising control compares two AC systems before their assigned connecting breaker closes. Voltage magnitude, frequency, phase relationship, breaker readiness and command authority are separate inputs to the closing decision.

In a microgrid reconnecting at its point of common coupling, a synchroniser can adjust the island reference while a separate permissive confirms the permitted relationship across the open breaker. For this reference, the drawing identifies “Synchronising state and time” at the input and “Synchronization timeout” at the output. The alarm should identify the unmet condition.

Identify the two measurement sides and the equipment receiving any adjustment request. Closing limits, breaker timing and loss-of-measurement behavior require the approved synchronising design. The functional block is an independent explanation of this named application. Equipment-specific ratings, terminal connections and operating conditions must be established in the project documentation.

How to read it

  • Start at the named input: Synchronising state and time. Identify its source device or document and the state represented on the drawing.
  • Follow the named output: Synchronization timeout. Cross-reference its destination and separate the command from confirmation that the equipment responded.
  • The alarm should identify the unmet condition.
  • Identify the two measurement sides and the equipment receiving any adjustment request. Closing limits, breaker timing and loss-of-measurement behavior require the approved synchronising design.

Information to show or reference

  • Label the source and connection reference for synchronising state and time.
  • Identify the destination and defined state of synchronization timeout.
  • Record the equipment or control-document revision supporting this functional block.
  • Check this application limit in the project design: The alarm should identify the unmet condition.

A distinction that matters

The alarm should identify the unmet condition. This reference describes the named application; it does not establish a new IEC graphical symbol, an ANSI device-function number or an exact manufacturer connection diagram.

Sources you can follow

These public references support the explanation and provide further detail. Their graphics and downloadable files remain with their publishers.

Microgrid Flex components and control design

Public technical context for microgrid synchronising interfaces. Microgrid power and control interfaces, synchronisation and source coordination. The application text and educational graphic are independently authored; the publisher does not certify this representation.

Schneider Electric · Public reference checked 3 November 2026 · Link only

About this graphic

This illustration was authored independently by Elora Grid to explain the concept. It is not reproduced from a customer drawing, an official standard graphic or a manufacturer CAD file. Its correspondence to an exact IEC or IEEE symbol identifier has not been certified.

SVG and DXF downloads contain this original artwork. Original artwork is available under CC BY 4.0. Third-party references retain their own terms.

Entry JSON · Entry Markdown · Last editorial update: 3 November 2026