Functional block · SDEPM

Station DC essential-load priority map

Functional block · Substations

An independently authored application reference. The drawing shows the named function or circuit relationship; use the project legend and selected equipment documentation for its drafting form and connections.

Browse this installation focus

In plain English

What this block does

Associates each assigned DC load with its documented operating priority.

A simple example

In a substation control building, the battery can support breaker trip circuits while the charger AC supply is unavailable. Supervision must identify whether the charger, battery or a downstream feeder is affected. For this reference, the drawing identifies “DC load schedule” at the input and “Priority classification” at the output. Priority does not establish required battery autonomy.

DC load scheduleSDEPMPriority classification
A reading guide. The entry's original illustration and input/output facts describe this application.

What the drawings help you do

Start at the named input: DC load schedule. Identify its source device or document and the state represented on the drawing. Follow the named output: Priority classification. Cross-reference its destination and separate the command from confirmation that the equipment responded.

Input
DC load schedule
Output
Priority classification
Application reference
An explanation of a named drawing function or circuit relationship; the project documents define the equipment and its connections.

Read the source: MicroGenius S2/S4 battery charger technical manual

Schematic · SDEPMStation DC essential-load priority map: original educational illustration
Original educational illustrationSee source and graphic notes

What it represents

Associates each assigned DC load with its documented operating priority. A station battery system supplies protection, control and other assigned DC loads through a documented charger and distribution arrangement. Charger output, battery contribution and load distribution are related but separately monitored paths.

In a substation control building, the battery can support breaker trip circuits while the charger AC supply is unavailable. Supervision must identify whether the charger, battery or a downstream feeder is affected. For this reference, the drawing identifies “DC load schedule” at the input and “Priority classification” at the output. Priority does not establish required battery autonomy.

Identify every source, protective device, isolation boundary and return. Battery capacity, DC fault duty, charging settings and ventilation require the selected battery-system design; illustrative circuits do not establish autonomy. The functional block is an independent explanation of this named application. Equipment-specific ratings, terminal connections and operating conditions must be established in the project documentation.

How to read it

  • Start at the named input: DC load schedule. Identify its source device or document and the state represented on the drawing.
  • Follow the named output: Priority classification. Cross-reference its destination and separate the command from confirmation that the equipment responded.
  • Priority does not establish required battery autonomy.
  • Identify every source, protective device, isolation boundary and return. Battery capacity, DC fault duty, charging settings and ventilation require the selected battery-system design; illustrative circuits do not establish autonomy.

Information to show or reference

  • Label the source and connection reference for dc load schedule.
  • Identify the destination and defined state of priority classification.
  • Record the equipment or control-document revision supporting this functional block.
  • Check this application limit in the project design: Priority does not establish required battery autonomy.

A distinction that matters

Priority does not establish required battery autonomy. This reference describes the named application; it does not establish a new IEC graphical symbol, an ANSI device-function number or an exact manufacturer connection diagram.

Sources you can follow

These public references support the explanation and provide further detail. Their graphics and downloadable files remain with their publishers.

MicroGenius S2/S4 battery charger technical manual

Public technical context for station battery and charger distribution. Battery charging modes, DC distribution interfaces and charger alarms. The application text and educational graphic are independently authored; the publisher does not certify this representation.

SENS · Public reference checked 3 November 2026 · Link only

About this graphic

This illustration was authored independently by Elora Grid to explain the concept. It is not reproduced from a customer drawing, an official standard graphic or a manufacturer CAD file. Its correspondence to an exact IEC or IEEE symbol identifier has not been certified.

SVG and DXF downloads contain this original artwork. Original artwork is available under CC BY 4.0. Third-party references retain their own terms.

Entry JSON · Entry Markdown · Last editorial update: 3 November 2026

Put the reference into a drawing workflow.

Elora Grid helps electrical teams work with drawings, specifications and equipment information. Explore the drafting workflow or join the early-access waitlist.