Functional block · SBI

Switchroom battery-low-voltage input

Functional block · Switchrooms

An independently authored application reference. The drawing shows the named function or circuit relationship; use the project legend and selected equipment documentation for its drafting form and connections.

Browse this installation focus

In plain English

What this block does

Receives the defined low-voltage indication from the station battery system.

A simple example

In a switchroom, the station battery can continue supplying protection and breaker controls during an AC supply interruption. The alarm system should distinguish charger loss from a low battery condition. For this reference, the drawing identifies “Battery voltage supervision” at the input and “Low-battery alarm” at the output. Voltage alone is not a complete capacity assessment.

Battery voltage supervisionSBILow-battery alarm
A reading guide. The entry's original illustration and input/output facts describe this application.

What the drawings help you do

Start at the named input: Battery voltage supervision. Identify its source device or document and the state represented on the drawing. Follow the named output: Low-battery alarm. Cross-reference its destination and separate the command from confirmation that the equipment responded.

Input
Battery voltage supervision
Output
Low-battery alarm
Application reference
An explanation of a named drawing function or circuit relationship; the project documents define the equipment and its connections.

Read the source: MicroGenius S2/S4 battery charger technical manual

Schematic · SBISwitchroom battery-low-voltage input: original educational illustration
Original educational illustrationSee source and graphic notes

What it represents

Receives the defined low-voltage indication from the station battery system. A room DC interface connects station battery distribution, alarm contacts and operating circuits. DC supplies may remain energized when the room's normal AC supply is unavailable, so their source and distribution boundaries must be shown separately.

In a switchroom, the station battery can continue supplying protection and breaker controls during an AC supply interruption. The alarm system should distinguish charger loss from a low battery condition. For this reference, the drawing identifies “Battery voltage supervision” at the input and “Low-battery alarm” at the output. Voltage alone is not a complete capacity assessment.

Identify the DC source, returns and monitored branches. Do not infer battery autonomy, conductor polarity, isolation or earthing arrangements from a generic power block. The functional block is an independent explanation of this named application. Equipment-specific ratings, terminal connections and operating conditions must be established in the project documentation.

How to read it

  • Start at the named input: Battery voltage supervision. Identify its source device or document and the state represented on the drawing.
  • Follow the named output: Low-battery alarm. Cross-reference its destination and separate the command from confirmation that the equipment responded.
  • Voltage alone is not a complete capacity assessment.
  • Identify the DC source, returns and monitored branches. Do not infer battery autonomy, conductor polarity, isolation or earthing arrangements from a generic power block.

Information to show or reference

  • Label the source and connection reference for battery voltage supervision.
  • Identify the destination and defined state of low-battery alarm.
  • Record the equipment or control-document revision supporting this functional block.
  • Check this application limit in the project design: Voltage alone is not a complete capacity assessment.

A distinction that matters

Voltage alone is not a complete capacity assessment. This reference describes the named application; it does not establish a new IEC graphical symbol, an ANSI device-function number or an exact manufacturer connection diagram.

Sources you can follow

These public references support the explanation and provide further detail. Their graphics and downloadable files remain with their publishers.

MicroGenius S2/S4 battery charger technical manual

Public technical context for switchroom dc interfaces and alarm collection. Battery charging modes, DC distribution interfaces and charger alarms. The application text and educational graphic are independently authored; the publisher does not certify this representation.

SENS · Public reference checked 3 November 2026 · Link only

About this graphic

This illustration was authored independently by Elora Grid to explain the concept. It is not reproduced from a customer drawing, an official standard graphic or a manufacturer CAD file. Its correspondence to an exact IEC or IEEE symbol identifier has not been certified.

SVG and DXF downloads contain this original artwork. Original artwork is available under CC BY 4.0. Third-party references retain their own terms.

Entry JSON · Entry Markdown · Last editorial update: 3 November 2026