In plain English

What this block does

Checks the documented prerequisites before connecting the assigned feeder in a restoration stage.

A simple example

In a microgrid recovering from a blackout, an available grid-forming source can establish the assigned island reference before compatible generation and eligible load groups are introduced under the validated restoration strategy. For this reference, the drawing identifies “Feeder status and permits” at the input and “Feeder connection permission” at the output. A control permissive does not prove field isolation removed correctly.

Feeder status and permitsMFERGFeeder connection permission
A reading guide. The entry's original illustration and input/output facts describe this application.

What the drawings help you do

Start at the named input: Feeder status and permits. Identify its source device or document and the state represented on the drawing. Follow the named output: Feeder connection permission. Cross-reference its destination and separate the command from confirmation that the equipment responded.

Input
Feeder status and permits
Output
Feeder connection permission
Application reference
An explanation of a named drawing function or circuit relationship; the project documents define the equipment and its connections.

Read the source: Avista Shared Energy Economy microgrid protection and control case study

Schematic · MFERGMicrogrid feeder energization readiness gate: original educational illustration
Original educational illustrationSee source and graphic notes

What it represents

Checks the documented prerequisites before connecting the assigned feeder in a restoration stage. Black-start and restoration control coordinates the establishment of an electrical reference and the gradual return of assigned resources and loads. A dead system, an available starting source and a successful load restoration are distinct states.

In a microgrid recovering from a blackout, an available grid-forming source can establish the assigned island reference before compatible generation and eligible load groups are introduced under the validated restoration strategy. For this reference, the drawing identifies “Feeder status and permits” at the input and “Feeder connection permission” at the output. A control permissive does not prove field isolation removed correctly.

Show the prerequisites and confirmation at each control boundary. These original explanatory blocks are not an operating procedure; energization, protection, transformer inrush and motor reacceleration require system-level validation. The functional block is an independent explanation of this named application. Equipment-specific ratings, terminal connections and operating conditions must be established in the project documentation.

How to read it

  • Start at the named input: Feeder status and permits. Identify its source device or document and the state represented on the drawing.
  • Follow the named output: Feeder connection permission. Cross-reference its destination and separate the command from confirmation that the equipment responded.
  • A control permissive does not prove field isolation removed correctly.
  • Show the prerequisites and confirmation at each control boundary. These original explanatory blocks are not an operating procedure; energization, protection, transformer inrush and motor reacceleration require system-level validation.

Information to show or reference

  • Label the source and connection reference for feeder status and permits.
  • Identify the destination and defined state of feeder connection permission.
  • Record the equipment or control-document revision supporting this functional block.
  • Check this application limit in the project design: A control permissive does not prove field isolation removed correctly.

A distinction that matters

A control permissive does not prove field isolation removed correctly. This reference describes the named application; it does not establish a new IEC graphical symbol, an ANSI device-function number or an exact manufacturer connection diagram.

Sources you can follow

These public references support the explanation and provide further detail. Their graphics and downloadable files remain with their publishers.

Avista Shared Energy Economy microgrid protection and control case study

Public technical context for microgrid black-start and restoration controls. Storage, protection, black start, load restoration and coordinated island operation. The application text and educational graphic are independently authored; the publisher does not certify this representation.

SEL · Public reference checked 3 November 2026 · Link only

About this graphic

This illustration was authored independently by Elora Grid to explain the concept. It is not reproduced from a customer drawing, an official standard graphic or a manufacturer CAD file. Its correspondence to an exact IEC or IEEE symbol identifier has not been certified.

SVG and DXF downloads contain this original artwork. Original artwork is available under CC BY 4.0. Third-party references retain their own terms.

Entry JSON · Entry Markdown · Last editorial update: 3 November 2026

Put the reference into a drawing workflow.

Elora Grid helps electrical teams work with drawings, specifications and equipment information. Explore the drafting workflow or join the early-access waitlist.

Explore drafting