Functional block · MDIA

Microgrid dispatch infeasibility alarm

Functional block · Microgrids

An independently authored application reference. The drawing shows the named function or circuit relationship; use the project legend and selected equipment documentation for its drafting form and connections.

Browse this installation focus

In plain English

What this block does

Reports that the requested allocation cannot satisfy the declared resource and operating constraints.

A simple example

In a microgrid with solar generation, a battery and generators, the controller can allocate an import/export target among the available resources while reserving the power needed for operating disturbances. For this reference, the drawing identifies “Target and resource constraints” at the input and “Dispatch infeasibility indication” at the output. The alarm must not imply a physically achievable target.

Target and resource constraintsMDIADispatch infeasibilityindication
A reading guide. The entry's original illustration and input/output facts describe this application.

What the drawings help you do

Start at the named input: Target and resource constraints. Identify its source device or document and the state represented on the drawing. Follow the named output: Dispatch infeasibility indication. Cross-reference its destination and separate the command from confirmation that the equipment responded.

Input
Target and resource constraints
Output
Dispatch infeasibility indication
Application reference
An explanation of a named drawing function or circuit relationship; the project documents define the equipment and its connections.

Read the source: Microgrid control systems

Schematic · MDIAMicrogrid dispatch infeasibility alarm: original educational illustration
Original educational illustrationSee source and graphic notes

What it represents

Reports that the requested allocation cannot satisfy the declared resource and operating constraints. Active-power dispatch allocates the electrical work performed by the microgrid resources. A total site target, a resource power limit and the actual measured contribution are different quantities that must be connected clearly in the diagram.

In a microgrid with solar generation, a battery and generators, the controller can allocate an import/export target among the available resources while reserving the power needed for operating disturbances. For this reference, the drawing identifies “Target and resource constraints” at the input and “Dispatch infeasibility indication” at the output. The alarm must not imply a physically achievable target.

Identify the measurement boundary, power sign convention, resource limits and target priority. An original control block does not supply dispatch settings, a financial operating policy or proof of grid-code compliance. The functional block is an independent explanation of this named application. Equipment-specific ratings, terminal connections and operating conditions must be established in the project documentation.

How to read it

  • Start at the named input: Target and resource constraints. Identify its source device or document and the state represented on the drawing.
  • Follow the named output: Dispatch infeasibility indication. Cross-reference its destination and separate the command from confirmation that the equipment responded.
  • The alarm must not imply a physically achievable target.
  • Identify the measurement boundary, power sign convention, resource limits and target priority. An original control block does not supply dispatch settings, a financial operating policy or proof of grid-code compliance.

Information to show or reference

  • Label the source and connection reference for target and resource constraints.
  • Identify the destination and defined state of dispatch infeasibility indication.
  • Record the equipment or control-document revision supporting this functional block.
  • Check this application limit in the project design: The alarm must not imply a physically achievable target.

A distinction that matters

The alarm must not imply a physically achievable target. This reference describes the named application; it does not establish a new IEC graphical symbol, an ANSI device-function number or an exact manufacturer connection diagram.

Sources you can follow

These public references support the explanation and provide further detail. Their graphics and downloadable files remain with their publishers.

Microgrid control systems

Public technical context for microgrid active-power dispatch controls. Active and reactive power, generation, load control, operating reserves and system supervision. The application text and educational graphic are independently authored; the publisher does not certify this representation.

SEL · Public reference checked 3 November 2026 · Link only

About this graphic

This illustration was authored independently by Elora Grid to explain the concept. It is not reproduced from a customer drawing, an official standard graphic or a manufacturer CAD file. Its correspondence to an exact IEC or IEEE symbol identifier has not been certified.

SVG and DXF downloads contain this original artwork. Original artwork is available under CC BY 4.0. Third-party references retain their own terms.

Entry JSON · Entry Markdown · Last editorial update: 3 November 2026

Put the reference into a drawing workflow.

Elora Grid helps electrical teams work with drawings, specifications and equipment information. Explore the drafting workflow or join the early-access waitlist.

Explore drafting