Functional block · MRDTM

Microgrid reactive dispatch tracking monitor

Functional block · Microgrids

An independently authored application reference. The drawing shows the named function or circuit relationship; use the project legend and selected equipment documentation for its drafting form and connections.

Browse this installation focus

In plain English

What this block does

Compares assigned reactive-power demand with the measured contribution.

A simple example

In an islanded microgrid, the assigned reference source supports bus voltage while other compatible resources share reactive demand according to the selected control method. Grid-connected operation can use a different objective at the PCC. For this reference, the drawing identifies “Reactive request and measurement” at the input and “Reactive tracking error” at the output. Sign and measurement timing must match.

Reactive request and measurementMRDTMReactive tracking error
A reading guide. The entry's original illustration and input/output facts describe this application.

What the drawings help you do

Start at the named input: Reactive request and measurement. Identify its source device or document and the state represented on the drawing. Follow the named output: Reactive tracking error. Cross-reference its destination and separate the command from confirmation that the equipment responded.

Input
Reactive request and measurement
Output
Reactive tracking error
Application reference
An explanation of a named drawing function or circuit relationship; the project documents define the equipment and its connections.

Read the source: Microgrid control systems

Schematic · MRDTMMicrogrid reactive dispatch tracking monitor: original educational illustration
Original educational illustrationSee source and graphic notes

What it represents

Compares assigned reactive-power demand with the measured contribution. Voltage and reactive-power control coordinate the AC operating condition of the microgrid resources. A voltage target, reactive-power target and power-factor target represent different control objectives and should have explicit ownership.

In an islanded microgrid, the assigned reference source supports bus voltage while other compatible resources share reactive demand according to the selected control method. Grid-connected operation can use a different objective at the PCC. For this reference, the drawing identifies “Reactive request and measurement” at the input and “Reactive tracking error” at the output. Sign and measurement timing must match.

Show each measured quantity, target and resource capability limit. Control-loop tuning, equipment capability and parallel operation require a validated design rather than an assumed property of the symbol. The functional block is an independent explanation of this named application. Equipment-specific ratings, terminal connections and operating conditions must be established in the project documentation.

How to read it

  • Start at the named input: Reactive request and measurement. Identify its source device or document and the state represented on the drawing.
  • Follow the named output: Reactive tracking error. Cross-reference its destination and separate the command from confirmation that the equipment responded.
  • Sign and measurement timing must match.
  • Show each measured quantity, target and resource capability limit. Control-loop tuning, equipment capability and parallel operation require a validated design rather than an assumed property of the symbol.

Information to show or reference

  • Label the source and connection reference for reactive request and measurement.
  • Identify the destination and defined state of reactive tracking error.
  • Record the equipment or control-document revision supporting this functional block.
  • Check this application limit in the project design: Sign and measurement timing must match.

A distinction that matters

Sign and measurement timing must match. This reference describes the named application; it does not establish a new IEC graphical symbol, an ANSI device-function number or an exact manufacturer connection diagram.

Sources you can follow

These public references support the explanation and provide further detail. Their graphics and downloadable files remain with their publishers.

Microgrid control systems

Public technical context for microgrid voltage and reactive-power controls. Active and reactive power, generation, load control, operating reserves and system supervision. The application text and educational graphic are independently authored; the publisher does not certify this representation.

SEL · Public reference checked 3 November 2026 · Link only

About this graphic

This illustration was authored independently by Elora Grid to explain the concept. It is not reproduced from a customer drawing, an official standard graphic or a manufacturer CAD file. Its correspondence to an exact IEC or IEEE symbol identifier has not been certified.

SVG and DXF downloads contain this original artwork. Original artwork is available under CC BY 4.0. Third-party references retain their own terms.

Entry JSON · Entry Markdown · Last editorial update: 3 November 2026